CWA/ICWA Final :: Operations and Project Management & Control : December 2002

I—13(OPM)
Revised Syllabus

Time Allowed : 3 Hours Full Marks : 100
Answer Question No. 1 which is compulsory and any two
from Section I & any two questions from Section II
Marks
1. (a) What do the following abbreviations stand for?
(i)AMT(ii)FMS(iii)VFM(iv)GT(v)CNC
1x5
(b) Match the words (a) to (j) under Column A with the corresponding words under Column B's (i) to (x) ½x10=5
AB
(a)Jigs(i)Inventory Control
(b)Annealing(ii)Material Handling
(c)FSN Analysis(iii)Job Evaluation
(d)Fixtures(iv)Quality Control
(e)Factor comparison Method(v)Investment decision
(f)Fork lift Trucks(vi)Tool Holding
(g)Bill of Materials(vii)Method Study
(h)Industrial Engineering(viii)Production plan
(i)Pay Back period(ix)Work piece holding
(j)Consumer's Risk(x)Heat treatment
(c) Match the Statement in Column A with the Statement under Column B: 1x5=5
(A)(B)
(i)Balancing Project(a)Enable to continue in business and
complete effectively.
(ii)Moderisation Project(b)Are undertaken to maintain
production at acceptable efficiency level.
(iii)Expansion Project(c)Seeks profitable investment
opportunities in altogether new area.
(iv)Diversification Project(d)Minimise under utilisation of capacity
(v)Replacement Project(e)Enables enlargement of the plant capacity.
(d) Define the following in not more than two sentences: 1x5=5
(i)Benefit-Cost ratio;(ii)Conceptual Phase of Product-life cycle:
(iii)Leasing financing;(iv)Item Rate Contract;
(v)Event Slack.  
SECTION I
 
2. (a) The Production Manager of a company is very much reluctant to initiate any action to improve productivity during the recession in his industry. Enumerate your views in the above context. 6
(b) Dumpers are used to transport the Steel Ingot from the Melting shop to Ingot yard, which is situated at a distance of 0.6 km from the Melting shop. The capacity of the dumper is 8 tonnes. Due to speed restrictions, within the factory the dumper cannot run beyond 12 km/hour. In order to avoid congestion in the Melting shop, a minimum transportation of 3200 Tonnes is necessary per shift (of 8 hours duration).
Find the number of dumpers that would be required. Ignore the loading and unloading time.
6
(c) Name the important principles of Material Handling. 6
3. (a) List the important points that are to be checked thoroughly for assessing the soundness of a plant layout. 10
(b) Explain briefly the various types of maintenance undertaken in manufacturing operations. 10
4. (a) Is "Wage Incentive Scheme" the only way for increasing labour productivity? Comment precisely. 8
(b) Six jobs are to be carried out at three machines in the order:
Lathe → Milling → Boring

The data related to the time taken by each job on the 3 machines is given below. Each machine can process one job at a time.

Time-Seconds
JobMillingLatheBoring
1
2
3
4
5
6
300
400
200
100
400
300
500
800
900
700
600
750
400
800
700
600
200
450
You are required to—
(i)Determine the optimal sequence of the job.
(ii)Ascertain the minimum elapsed time.
6+6
Please turn over

( 2 )

F-13(OPM)
Revised syllabus
Marks
SECTION II
Answer any two out of the following questions under Section II.
 
5. (a) INTEL Project is having the following activities and their time estimates: 5+3+2
ActivityPredecessorTime (days)
 Optimistic (a)Likely (m)Pressimistic (b)
A
B
C
D
E
F
G
H

A
A
B
C,B
E
D
F,G
2
8
14
4
6
6
18
8
4
12
16
10
12
8
18
14
6
16
30
16
18
22
30
32
(i)Draw a PERT Network for the project.
(ii)Identify the critical path and calculate the earliest expected time to complete the project.
(b) What is 'pay back period'? Under what situations investment decisions are mainly guided by pay-back period method? 2+2=4
(c) What are the main differences between PERT & CPM? 6
6. (a)

S Limited has Rs. 10,00,000 allocated for capital budgeting purposes. The following proposals and associated Profitability Index have been determined.

10
ProjectAmount (Rs.)Profitability Index
1
2
3
4
5
6
300,000
150,000
350,000
450,000
200,000
400,000
1.22
0.95
1.20
1.18
1.20
1.05
Which of the above investment should be undertaken?
Assume that the Projects are indivisible and there is no alternative use of the money allotted for capital budgeting.
(b) How gestation period of an on-going project affects Project financing decisions? 2
(c) How to combat the dilemma of project failures especially due to the shortage of funds from the Government coffers. 8
7. (a) An Investor wants to invest in a profitable project considering the opportunities available and business environment. As a Cost Accountant, suggest some sources for Project identification. 10
(b) What is Feasibility Study? 6
(c) What are the main objectives of pre-feasibility Study? 4
__________