1. |
(a) |
What do the following abbreviations stand for?
(i) | AMT | (ii) | FMS | (iii) | VFM | (iv) | GT | (v) | CNC |
|
1x5 |
|
(b) |
Match the words (a) to (j) under Column A with the corresponding words under Column B's (i) to (x) |
½x10=5 |
|
A | B |
(a) | Jigs | (i) | Inventory Control |
(b) | Annealing | (ii) | Material Handling |
(c) | FSN Analysis | (iii) | Job Evaluation |
(d) | Fixtures | (iv) | Quality Control |
(e) | Factor comparison Method | (v) | Investment decision |
(f) | Fork lift Trucks | (vi) | Tool Holding |
(g) | Bill of Materials | (vii) | Method Study |
(h) | Industrial Engineering | (viii) | Production plan |
(i) | Pay Back period | (ix) | Work piece holding |
(j) | Consumer's Risk | (x) | Heat treatment |
|
|
|
(c) |
Match the Statement in Column A with the Statement under Column B: |
1x5=5 |
| |
| (A) | | (B) |
(i) | Balancing Project | (a) | Enable to continue in business and complete effectively. |
(ii) | Moderisation Project | (b) | Are undertaken to maintain production at acceptable efficiency level. |
(iii) | Expansion Project | (c) | Seeks profitable investment opportunities in altogether new area. |
(iv) | Diversification Project | (d) | Minimise under utilisation of capacity |
(v) | Replacement Project | (e) | Enables enlargement of the plant capacity. |
|
|
|
(d) |
Define the following in not more than two sentences: |
1x5=5 |
| |
(i) | Benefit-Cost ratio; | (ii) | Conceptual Phase of Product-life cycle: |
(iii) | Leasing financing; | (iv) | Item Rate Contract; |
(v) | Event Slack. | | |
|
|
SECTION I |
|
2. |
(a) |
The Production Manager of a company is very much reluctant to initiate any action to improve productivity during the recession in his industry. Enumerate your views in the above context. |
6 |
|
(b) |
Dumpers are used to transport the Steel Ingot from the Melting shop to Ingot yard, which is situated at a distance of 0.6 km from the Melting shop. The capacity of the dumper is 8 tonnes. Due to speed restrictions, within the factory the dumper cannot run beyond 12 km/hour. In order to avoid congestion in the Melting shop, a minimum transportation of 3200 Tonnes is necessary per shift (of 8 hours duration).
Find the number of dumpers that would be required. Ignore the loading and unloading time. |
6 |
|
(c) |
Name the important principles of Material Handling. |
6 |
3. |
(a) |
List the important points that are to be checked thoroughly for assessing the soundness of a plant layout. |
10 |
|
(b) |
Explain briefly the various types of maintenance undertaken in manufacturing operations. |
10 |
4. |
(a) |
Is "Wage Incentive Scheme" the only way for increasing labour productivity? Comment precisely. |
8 |
|
(b) |
Six jobs are to be carried out at three machines in the order:
Lathe → Milling → Boring |
|
|
|
The data related to the time taken by each job on the 3 machines is given below. Each machine can process one job at a time. |
|
| |
Time-Seconds |
Job | Milling | Lathe | Boring |
1 2 3 4 5 6 |
300 400 200 100 400 300 |
500 800 900 700 600 750 |
400 800 700 600 200 450 |
|
|
|
You are required to—
(i) | Determine the optimal sequence of the job. |
(ii) | Ascertain the minimum elapsed time. |
|
6+6 |