1. | (a) | State the correct answer in each of the following statements by writing only the capital letter given under it: | 1x5 | |
| | (i) | Synergy is often expressed A. | 2 + 2 is 5 | B. | 2 + 2 is 4 | C. | 2 + 2 is < 4 | D. | 2 + 2 is > 4 | | | (1) |
| | (ii) | Control in management parlance consists of five actions 1. | Planning; | 2. | Comparison of achievement of plan; | 3. | Assessment of deviations; | 4. | Corrective action for mismatch of performance with the plan | 5. | Execution. | The correct sequence of these activities is |
A. | 1 – 2 – 3 – 4 – 5 | B. | 1 – 5 – 3 – 4 – 2 | C. | 1 – 4 – 5 – 3 – 2 | D. | 1 – 5 – 2 – 3 – 4. | | | (0) |
| | (iii) | The basic problems in design of organisation structure are 1. | Ensuring functional excellence; | 2. | Ensuring coordination; | 3. | Ensuring sense of belonging; | 4. | Ensuring control. | As a matter of fact, the problems are |
A. | 1 + 2 + 3 + 4 | B. | 1 + 2 | C. | 1 + 2 + 4 | D. | 2 + 3 + 4 | | | (0) |
| | (iv) | The formula suggested by E.H.Bowman for optinum production rate P1 for a period is A. | aWt–1 + bIt–1 + cFt+1 + K | B. | aWt–1 – bIt–1 + cFt+1 + K | C. | aWt–1 – bIt–1 – cFt+1 + K | D. | aWt–1 – bIt–1 – cFt+1 – K | Where Wt – 1 = the workforce in the previous period It–1 = the ending inventory for the previous period Ft+1 = the forecast of demand for the next period a, b, c, K are constants the values whereof are obtained by using regresion analysis. | | | (0) |
| | (v) | The theory of constraints, as developed by Dr. Goldratt, evaluates performance by three measures, viz., Throughput (T), Inventory (I), and operating expenses (O), Of these measures, the most important one is A. | T as it focuses on sales | B. | I as it puts a zero value on unsold inventory | C. | O as it aims a reducing operating expense | D. | T, I, and O in a judicious combination, as they are seperate but interrelated processes and concepts to increase return on investment and cash flow. | | | (0) |
| (b) | State which of the two words given in brackets should better fill in the gap in each of the following statements: | 1x5 | |
| | (i) | In operations management TOC, in a word, is "balance of flow, not the _______? [capacity/production]. | | (0) |
| | (ii) | Data mining, or the process of analysing empirical data, allows for the _______ of information. [interpolation/extrapolation]. | | (0) |
| | (iii) | _______ can help users to locate and view information faster. [Internate/Intranets]. | | (0) |
| | (iv) | The process of determining gross requirements of components is termed ‘the _______ process’. [explosion/inclusion] | | (0) |
| | (v) | The central focus of distribution is to increase the efficiency of time, place, and ________ utility. [customer/delivery] | | (0) |
| (c) | State if each of the following statements is T (true) or F (false): | 1x5 | |
| | (i) | Value Analysis (VA) process is a less important tool than Function Analysis System Technique (FAST). | | (0) |
| | (ii) | The term ‘value’ has four different meanings, namely exchange value, cost value, use value, wealth value. | | (0) |
| | (iii) | Internal quality costs consist of preventive costs, Appraisal costs, and Failure costs. | | (0) |
| | (iv) | The phrases ____ right first time or zero defects — were promoted by the Japanese quality expert Kaoru Ishikawa. | | (0) |
| | (v) | The BSC (Balanced Scorecard) puts more stress on financial parameters than on non–financial parameters since its objective is the growth of the organization. | | (0) |
| (d) | Match the items in Group X with the relevant items in Group Y, using failure mode and effects analysis (FMEA): Group X | Group Y | (i) (ii) (iii) (iv) | A Top–down analysis Bottom–up analysis C. component analysis D. functional analysis | (a) (b) (c) (d) | Looks at failure from the product user’s stand point FMEAs are done on smallest pieces first FMEAs are done on the physical parts of the system FMEAs are done on the larger items first |
Note: Your answer should consist of two letters only like (i) As, Ab, Ac or Ad (ii) Ba, Bb, Bc or Bd etc. | 1x4 | (0) |
| (e) | State the correct answer (= 1 mark) showing your workings (= 2 marks) for each of the following two problems. | (1+2)x2 | |
| | (i) | Division R makes a single product. Information for the division for the year just ended is Sales Fixed costs Depreciation Residual income Net assets | Rs. Rs. Rs. Rs. | 30,000 units 48,70,000 24,75,000 4,72,000 1,25,00,000 |
Head Office assesses divisional performance by the residual income achieved. It uses a cost of capital of 12% a year. Division R’s average contribution per unit was A—Rs. 148.20; | B—Rs. 228.10; | C—Rs. 280.60; | D—Rs. 310.56. | | | (0) |
| | (ii) | Brilliant Ltd. has developed a new product. The nature of Brilliant’s work is repetitive and it is usual for there to be an 80% learning effect when a new product is developed. The time taken for the first unit was 22 minutes. Assuming that an 80% learning effect applies, the time to be taken for the fourth unit is nearest to A—9.91 mins; | B—9.97 mins; | C—14.08 mins; | D—15.45 mins. |
[The exponent b in the formula Yx = aXb is given as — 0.322 for an 80% learning curve.] | | (0) |
2. | (a) | The research and development department of Innovative Ltd. has produced specifications for two new products. Modalf and Modbet for consideration by company’s production director. The director has received detailed costings which can be summarized as follows: | Modalf Rs. | Modbet Rs. | Direct costs | Material Labour (Rs. 3 per hour) | 64 18 82 | 38 6 44 | Factory overheads | (Rs. 3 per machine hour) Total estimated unit cost | 18 100 | 6 50 |
The sales department has provided estimates of the probabilities of various levels of demand for two possible prices for each product. The details are as follows: | Modalf Rs. | Modbet Rs. | Low price alternative selling price Demand estimates: Pessimistic–probability 0.2 Most likely–probability 0.5 Optimistic–probability 0.3 High price alternative: Selling price Demand estimates: Pessimistic–Probability 0.2 Most likely–probability 0.5 Optimistic–probability 0.3 | 120
1,000 2,000 3,000
130
500 1,000 1,500 | 60
3,000 4,000 5,000
70
1,500 2,500 3,500 |
It would be possible to adopt the low price alternative for either product together with the high price alternative for the other product (demand estimates are independent for the two products). The factory has 60,000 machine hours available during the year. For some year past it has been working at 90% of practical capacity making a standardized product. This product is very profitable and it is only the availability of 6,000 hours of spare machine capacity that has made it necessary to search for additional product lines to use the machines fully. The actual level of demand will be known at the time of production. The monthly fixed cost is estimated at Rs. 10,000 and the variable cost at Re. 1 per machine hour. The management seeks your advice for the best plan for the utilization of the 6,000 machine hours, to comment on the rational selling price alternatives that exist for this plan and to calculate the expected increase in annual profit which would arise for each alternative. | 10 | (0) |
| (b) | (i) | Briefly describe the operation of an MRP system. | 3 | (0) |
| | (ii) | Ho MRP II differs from MRP I? | 2 | (0) |
3. | Sun Ltd. is considering renting additional factory space to make two products. P – 1 and P – 2. You are the company’s management accountant and have prepared the following monthly budget: | P – 1 Rs. | P – 2 Rs. | Total Rs. | Sales (units) Sales revenue Variable material and labour costs Fixed production overhead (allocated on direct labour hours) Fixed administration overheads (allocated on sales value) Profit | 4,000 80,000 (60,000) (9,000)
(1,600)
8,500 | 2,000 1,00,000 (62,000) (18,000)
(2,000)
18,000 | 6,000 1,80,000 (1,22,000) (27,900)
(3,600)
26,500 |
The fixed overheads in the budget can only be avoided if neither product is manufactured. Facilities are fully interchangeable between products. As an alternative to the manual production process assumed in the budget, Sun Ltd. has the option of adopting a computer aided process. This process would cut variable costs of production by 15% and increase fixed costs by Rs. 12,000 per month. The management is not sure about demand for the new products. The management believes the company will have to depart from its usual cash sales policy in order to sell P – 2. An average of three months credit would be given and bad debts and administration costs would probably amount to 4% of sales revenue for this product. Both products will be sold at the prices assumed in the budget. Sun Ltd. has a cost of capital of 2% per month. No stocks will be held. (a) | Calculate the sales revenues at which operations will break–even for each process (manual and computer aided) and calculate the sales revenue at which Sun Ltd. will be indifferent between the two process: | (i) | If P – 1 alone is sold; | (ii) | If P – 1 and P – 2 units are sold in the ratio 4 : 1, with P – 2 being sold on credit. | (b) | Explain the implications of your results with regard to the financial viability of P – 1 and P – 2. | | 4+6+5 | (0) |
4. | (a) | What is lean manufacturing? Briefly describe the lean/JIT system. | 10 | (0) |
| (b) | In the matter of operations management state any five options that can be used to adjust capacity to match current demand. | 5 | (0) |
|
5. | (a) | A company is considering whether to develop and market a new product. Development costs are estimated to be Rs. 1,80,000, and there is a o.75 probability that the development effort will be successful and a 0.25 probability that the development effort will be unsuccessful. If the development is successful, the product will be marketed, and it is estimated that (i) (ii) (iii) | If the product is very successful profits will be Rs. 5,40,000; If the products is moderately successful profits will be Rs. 1,00,000; If the product is a failure there will be a loss of Rs. 4,00,000. |
Each of the above profit and loss calculation is after taking into account the development costs of Rs. 1,80,000. The estimated probabilities of each of the above events are as follows: (1) (2) (3) | Very successful Moderately successful Failure | 0.4 0.3 0.3 |
Required: (i) | Prepare decision tree; | | 5+5 | (0) |
| (b) | Identify the assumptions on which cost–volume profit analysis is based. | 5 | (0) |
6. | (a) | Explain the concept of learning curve and state how relevant is the same is managing cost. | 5 | (0) |
| (b) | A company has developed a special purpose Electronic Security Device and once introduced in the market, the same expected to have a life cycle of 3 years from the time of its introduction in the market before the Device becomes obsolete due to technological and advancement of other competitive products. You have been asked by the company to prepare a product life cycle budget. The following information are available: | Year 1 | Year 2 | Year 3 | No. of units to be manufactured and sold Price per device (Rs.) R & D and Design cost (Rs.) Production cost: Variable cost per Device (Rs.) Fixed cost (Rs.) Marketing cost: Variable cost per Device (Rs.) Fixed cost (Rs.) Distribution cost: Variable cost per Device (Rs.) Fixed cost (Rs.) | 50,000 500 9,00,000
200 70,00,000
100 30,00,000
50 10,00,000 | 2,00,000 400 1,00,000
150 70,00,000
70 25,00,000
50 10,00,000 | 1,50,000 350 Nil
150 70,00,000
60 25,00,000
50 10,00,000 | Prepare the budgeted life cycle operating profit. It has been further indicated that if a discount of 10% is given to customes, the units to be sold per year will increase by 5%. Would you recommend introduction of such discount? | 5+5 | (0) |
7. | (a) | Write a note on Cause–effect diagram. When it should be used? | 5+5+3+2 | (0) |
| (b) | After inspection of 10 rods, each of length 5 metres, the following number of defects is found on each rod: 45, 42, 52, 46, 51, 46, 50, 43, 51, 49. Which type of control chart would be suitable to control the defects? Justify. | | (0) |
| (c) | Distinguish between proportion defective (p) chart and number defective (np) chart. | | (0) |
| (d) | Draw a diagram to show trend in the control chart. How do you interpret the trend in the control chart? | | (0) |
8. | Write short notes on (any three): | 5x3 | |
| (a) | Value Analysis; | | (0) |
| (b) | Supply Chain Management; | | (0) |
| (c) | Enterprise Risk Management; | | (0) |
| (d) | Decision Tree. | | (0) |